Manual monitoring results of waste gas and wastewater in Gushen Group Power Plant in 2018

Column:Industry News Time:2018-07-07
Manual monitoring results of waste gas and wastewater in 2018 by the Energy Division of Gushen Group

Manual monitoring results of waste gas and wastewater in 2018 by the Energy Division of Gushen Group    

The first season

Second quarter

The third quater

1

Test items

Test result (mg/m3)

1

Test items

Test result (mg/m3)

1

Test items

Test result (mg/m3)

Exhaust gas

Sulfur dioxide


13

Exhaust gas

Sulfur dioxide


6

Exhaust gas

Sulfur dioxide


31

Nitrogen oxides

35

Nitrogen oxides

27

Nitrogen oxides

62

Smoke

6.9

Smoke

7.6

Smoke

2.3

Mercury and its compounds

0.0000091

Mercury and its compounds

0.014

Mercury and its compounds

0.000007

Ringman black

1级

Ringman black

1级

Ringman black

1级


Factory boundary particles

0.249


Factory boundary particles

0.477


Factory boundary particles

0.264

Boundary noise

昼  65dB(A)

Boundary noise

昼  58.9dB(A)

Boundary noise

昼  57.4dB(A)

夜  55dB(A)

夜  48.7dB(A)

夜  47.9dB(A)

2

Test items

Test result (mg/m3

2

Test items

Test result (mg/m3

2

Test items

Test result (mg/m3


Waste water

ph

7.76

Waste water

ph

7.56

Waste water

ph

7.12

lead

0.179

lead

<0.2

lead

0.476

cadmium

0.049

cadmium

<0.05

cadmium

<0.05

HG

0.00072

HG

未检出

HG

0.00062

Arsenic

0.0061

Arsenic

未检出

Arsenic

0.0005